Cost guide

How to read a kitchen remodel bid in Brevard County

Two bids for the same kitchen can look far apart because they cover different jobs. This guide shows how to read a kitchen bid line by line, how to spot allowances and exclusions and how to put several proposals on one page. For the factors that move a price, see the cost page.

Get My Free Estimate

Free estimate, no obligation. Takes about a minute.

Step one: put every bid in the same table

Make a table with one row for each item and one column for each contractor. Rows should include demolition, cabinets, counters, backsplash, sink and faucet, appliances, electrical, plumbing, flooring, painting, permits, disposal and cleanup. Fill in what each bid says, and write “not mentioned” where it is silent.

The blanks are the finding. A bid with many blanks may be cheaper because the work is omitted, not because it is more efficient.

Step two: look for allowances

An allowance is a placeholder amount for something you have not chosen yet, such as counters, tile or lighting. If the allowance is low, the final price rises once you choose. Ask each contractor what allowance is used for each item, then compare them with real prices at the showroom.

Step three: read the exclusions

Exclusions are not wrong, but you should know who pays for them.

  • Painting and wall repair after demolition.
  • Flooring patches where cabinets were removed.
  • Electrical panel upgrades.
  • Appliance delivery and installation.
  • Permit fees and inspections.
  • Removal of old materials.

Step four: check trades and license numbers

Florida requires the contractor’s license number on proposals. Verify it on the state DBPR site. Florida law also requires a general, building or residential contractor to subcontract electrical, plumbing and mechanical work unless certified for it, so ask for the electrician and plumber by name.

Step five: understand payment stages

A deposit is common, followed by payments tied to stages such as cabinet delivery, rough-in inspection and completion. Avoid paying ahead of completed work, and ask how change orders will be written and approved before extra work begins.

Step six: ask about schedule and warranty

Compare how each contractor handles cabinet lead time, inspections and the final walkthrough. Ask what is warranted, for how long and who responds to a callback. Keep a copy of the contract and every change order.

Red flags in a proposal

Slow down if you see any of these. A good contractor is willing to answer questions in writing and let you compare proposals at your own pace.

  • No license number or a number that does not verify.
  • A request for a large payment before any work.
  • A vague scope such as “remodel kitchen” with no itemization.
  • Pressure to sign quickly.

Using the table to negotiate

Once the table is complete, ask each contractor to explain the biggest differences. Often a bid changes when you ask to include a missing item, which shows that the original number covered less. Use the table to ask for the same assumptions from every bidder, not to push for the lowest total.

Reading a kitchen estimate

A kitchen bid for your project should name the cabinet line, countertop material, appliances allowance, plumbing and electrical work and permits as their own items. Kitchen estimates, explained. Ask when cabinets would be ordered, how long delivery takes and what happens to your kitchen use in between. A bid that names a start date without mentioning lead times for cabinets and countertops may leave a gap you discover later. Ask also which appliances are included, who handles disposal of the old kitchen and whether the price changes if the electrician finds an undersized panel or circuit.

From layout idea to finished kitchen

  1. Measure the room and agree on the layout, including appliances and storage.
  2. Compare itemized proposals covering cabinets, counters, plumbing and electrical.
  3. Order cabinets and counters early because lead times drive the calendar.
  4. Confirm permits, inspections and who coordinates the trades.
  5. Walk the finished kitchen, test appliances and keep warranty and permit papers.

Before you pick a kitchen contractor

Confirm the license on the DBPR site and ask for proof of liability insurance before you commit to this kind of project. Ask which licensed electrician and plumber will do that work, and whether any wall coming out is load-bearing. More on the process is on how to check a contractor. Ask who coordinates the plumber, electrician and countertop fabricator, and whether the permit covers the trades together. Good answers are specific names and steps, not general reassurance. Also ask what the warranty covers, who answers a callback after the final walkthrough, and how a damaged cabinet or counter is handled before it goes in.

Kitchen remodeling questions

What is an allowance in a kitchen bid?

A placeholder amount for a selection you have not made, such as counters or tile. If real choices cost more than the allowance, the price rises. Ask each contractor what allowance is used and compare it to showroom prices. Ask which allowances are in each bid before comparing totals.

Why do bids for the same kitchen differ?

Usually because scope, materials or allowances differ. Compare line by line, mark items that are missing and ask each contractor to price the same selections and the same assumptions about demolition and repairs. A demolition line that says only "remove existing" hides a lot of work.

How do I verify a contractor’s license?

Search the license number or name on the state DBPR site and confirm it is active and covers the work. Florida requires the number on proposals, and the permit should be in the contractor’s name. Ask for a certificate of insurance at the same time.

What should I do about change orders?

Require them in writing before extra work begins, with the cost and schedule effect listed. Keep a log of each change and keep copies with the contract and payment records. Small verbal changes are a common source of arguments at the end of a project, so a short form signed by both sides helps.

Kitchen projects behind this guide

Where this page gets its permit facts:Florida Statutes 553.79 (permits and exemptions) (accessed Nov 2026); Florida Statutes 489.113 (contractor scope and subcontracting) (accessed Nov 2026); Florida Statutes 489.119 (contractor license number in proposals) (accessed Nov 2026). General information, not legal advice; confirm with the office that covers your address.

Reviewed November 2026.